close
+86 13527814016
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

How to build a water park? The detailed process is here-2

How to build a water park? The detailed process is here-2

Basic process of water park construction

After obtaining the land use right and project approval, carry out:           

(1) Conceptual design planning stage           

1. Select the concept design unit to carry out the docking of the concept design work;            2. Creative theme, story line theme image equipment list floor layout, overall aerial view, equipment outsourcing style, etc.           

(2) Selection stage of water amusement facilities           

1. Select and purchase equipment according to the equipment list provided by conceptual design, and determine the equipment production cycle;           

2. Determine equipment location, floor area and foundation drawings.           

(3) Planning and design stage of water park            

Scheme design:           

1. Interior packaging design of each partition plan, general plan, visitor moving line, traffic route and evacuation route;           

2. Interior landscape design, interior landscape props style design, assist tool props design;          

3. Lighting system design.           

Expansion design indoor packaging design:           

1. Interior landscape design;           

2. Environment art and scene props;           

3. Equipment packaging design;            

4. Lighting system design.           

Construction design:           

Including interior packaging design, landscape design, environmental art and scene props, equipment supporting packaging design, lighting system design, logo system design theme, logo design function logo, etc.

Civil construction stage

According to the planning drawings of the water park, pay special attention to the location of embedded parts, water inlet and outlet, load-bearing structure, etc.

Equipment installation and commissioning           

1. Registration and filing of quality supervision department;           

2. Equipment installation, equipment installation and commissioning;           

3. Amusement equipment acceptance certificate;           

4. Equipment maintenance and operation training.

Recruitment, establishment and training of operation team

1. Establishment of operation management system;           

2. Recruit core management and equipment maintenance personnel before equipment installation and commissioning;           

3. At the later stage of water park equipment installation and commissioning, the amusement equipment operators are in place;           

4. Service etiquette, process training and safety management training;           

5. Operation, maintenance and management personnel obtain corresponding certificates;           

6. Basic knowledge training of amusement equipment, operation emergency drill training, simulation and practical operation training of each post.

Trial operations

1. Employees are familiar with their own work process and service process;           

2. Collect feedback from tourists and upgrade;           

3. In the operation, we found the deficiencies and optimized the process;           

4. Troubleshooting and rectification of potential safety hazards.

Grand Opening

1. Prophase publicity;           

2. Activity arrangement;           

3. Passenger flow safety control;           

4. Crisis public relations drill;           

5. Safety emergency plan;           

6. Preferential policies for opening;           

7. Equipment maintenance and update.           

The preparation and construction of water park is not a simple project preparation and construction, but a process of overall planning, operation and management of the project as a whole.



Related News
  • Theme landscape packaging design for water park equipment

    Theme landscape packaging design for water park equipment

    March 14, 2019With a large amount of capital entering the water park, the investment and development boom has started. The total number of water parks currently owned by China has basically reached saturation. The demand for water park equipment has also shifted from tview
  • Water park management data analysis is the top priority

    Water park management data analysis is the top priority

    April 15, 2021Water park management data analysis is the top priority 1. Analyze event planning and operation data. 2. Analyze content operation data. 3. Analyze project operation data.view
  • Ten years of ups and downs of theme park - part one

    Ten years of ups and downs of theme park - part one

    November 26, 2019In the past ten years, primary school students have grown into college students; in the past ten years, young people have become uncles; in the past ten years, black hair has gradually turned gray; in the past ten years, the stock market has been rising aview
  • New Amazing Water Park Coming Soon from HAISAN water slide company

    New Amazing Water Park Coming Soon from HAISAN water slide company

    July 7, 2017New Amazing Water Park in Forte da Oura, Albufeira, PortugalAddress: Apt 827, 8200-911Albufeira, Algarve,Portugal To be Open in Summer 2017, the water park equipment are supplied by HAISAN water slide company.view
  • How to manage water park equipment to attract more visitors?

    How to manage water park equipment to attract more visitors?

    July 12, 2019Water park is a place for tourists to play and spend. When choosing a water park, visitors will first choose a water park with good reputation. Good reputation is accumulating. Water park equipment with good reputation generally have excellent service andview
  • Tips to select water park equipment

    Tips to select water park equipment

    December 19, 2019Tips to select water park equipment Water Park, as the most popular leisure method for summer tourists, has created a paradise for people who experience the summer heat, leisure, and entertainment in the heat. Water parks are so popular. How can wateview
Online Servicetq_online