1. The design of underground pipeline network should fully consider the later maintenance relationship, especially the drainage and sewage pipelines. In the laying of strong and weak electric pipelines, trenches, brackets and concrete members should be designed to support them. Otherwise, once the factors such as subsidence, pipe breakage and tube burst occur, the maintenance workload, time consumption and cost loss will be very passive.           

2. All kinds of energy consumption (water, electricity) should be designed with metering tables, at least regionally, preferably independently, so as to facilitate the later operation and management. For example, some commercial rooms outsourced can be independently measured, and at the same time, it is also convenient for the rational management and control of energy consumption during the operation period.           

3. From the safety point of view, power planning, conditional double circuit must be included in the design planning; due to the characteristics and needs of water park, night lighting must be fully planned, from elevated lights to environmental lights, equipment lights, etc., to be considerate. In addition, the night lighting project is a scenic attraction of water park equipment, which should be carefully considered from the previous planning.           

4. Logistics support must be considered in the early stage of planning and design, such as dormitory, canteen, catering center, maintenance workshop, first-class warehouse and second-class warehouse. Other rigid supporting facilities, such as medical room, monitoring room, consulting center, ticketing center, reception center, toilet, locker, bathroom, staff lounge, meeting room, office, security duty room, staff Park Dining room, intelligent machine room, opening and closing room, distribution room, foot bath, etc., are designed according to the standard and reception capacity.

water park equipment
water park equipment from HAISAN


Related News
  • Some Operational Points in the Planning and Design of Water Park Equipment

    Some Operational Points in the Planning and Design of Water Park Equipment

    June 21, 2019Functional streamline is mainly designed from the perspective of tourists'experience. On the one hand, streamline design needs to conform to the rules of tourists'play and improve the reception efficiency of water park equipmentview
  • Five misunderstandings in water park management must be avoided

    Five misunderstandings in water park management must be avoided

    October 10, 2020There are many operators who have just startedto manage water parks. They will encounter problems of this kind or that whenoperating water park equipment, which will affect their income and makethemse...view
  • The cost to invest water park equipment

    The cost to invest water park equipment

    September 3, 2019Many customers often ask how much money is needed to invest water park equipment? 1 million? 2 million? 5 million? Or 10 million? In fact, this is a problem with no certain scope. After all, the investment can be large or small, not only related to the siview
  • Rapid development of indoor parent-child water park design

    Rapid development of indoor parent-child water park design

    October 21, 2019For parents who are “safety first, health first”, any factor that appears “smog, high temperature or rain and snow” will cancel the outdoor water park design. With a small and medium-sized indoor park as the main scene of the shopping center, rich themesview
  • What are the precautions before the water park opens?

    What are the precautions before the water park opens?

    June 28, 20202020 is an extraordinary year. Since the beginning of the new year, people’slives, work and entertainment have been greatly affected by the outbreak of thecovid-19 epidemic. From mid-June, as the dom...view
  • Design of moving line of parking lot and entrance-4

    Design of moving line of parking lot and entrance-4

    April 2, 2020There are several ways to calculate the parking lot area of theme park, but they are generally calculated according to the instantaneous peak value of the park's tourist volume. We commonly use the way we call it "theme park market penetration method".view
Online Servicetq_online