From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related News
  • The final aim of managment is customer's experience

    The final aim of managment is customer's experience

    October 31, 2017Nowadays, water park are built on an entertaining and fast-paced environment and water management becomes more and more important in water park. A professional water park management in a fast-paced en...view
  • The second part:Key issues in design and construction of water park

    The second part:Key issues in design and construction of water park

    November 19, 20191. Equipment packaging, entertainment and interactive designThe original water park generally has no packaging design, that is, the equipment will be opened when it is installed. Now the water park be...view
  • The high temperature in Chongqing makes the water park popular

    The high temperature in Chongqing makes the water park popular

    November 10, 2017For days, many parts of the country's temperature is more than 38 ℃ "steaming roast model". Some people hide in the air-conditioned room to blow cold air. Some people are floating on the edge of the ...view
  • Four Main Points of Water Park Design

    Four Main Points of Water Park Design

    July 6, 20171. Site selection and size should be carefulWater park location should be convenient in the traffic, the park is not the bigger the better, its size according to the local traffic can be achieved, the...view
  • Dream Water World

    Dream Water World

    August 20, 2018As a dream water world, a water park is an enjoyable place or a water play areas which have swimming pools, water slides, splash pads, and water playgrounds. Water parks are simply like a dream water ...view
  • How to Design a Good Water Slide Layout

    How to Design a Good Water Slide Layout

    April 23, 20211. The importance of water slidesAmong all water amusement equipment, the largest category undoubtedly belongs to water slides. Whether it is a large water slide or a small children's slide, its p...view
Online Servicetq_online