Related News

Key Points of Conceptual Plan Planning for Water Park Equipment - part one
August 14, 2019The first is to focus on market positioning, the second is product positioning, the third is equipment selection, and the fourth is the planning of related systems. Why should we emphasize these four issues in particular? Because this is the most error-prview
Basic knowledge of water park
January 3, 2020Basic knowledge of water park 1. Water park concept and classification: 1. Water park concept: Water park is a kind of theme park. It has the characteristics of large tourist carrying capacity, wide playable age range, and high revisit rate.view
How to build a water park? The detailed process is here-1
April 16, 2020Water park is one of the most popular theme tourism products in recent years. Generally speaking, the construction period of the water park is 6 to 18 months, the first two years are the return period, and the third year is the profit period. If the waterview
Inspection and repair of large water slide
July 3, 2019Water park equipment needs regular inspection and maintenance to ensure equipment safety. For large water slides, the inspection and maintenance contents are divided into daily inspection, weekly inspection and monthly inspection.view
Design of moving line of parking lot and entrance-2
March 27, 2020--Disabled parking space--- The width of general disabled parking spaces is 2.5m * 1.6x = 4.0m, with a length of 5m; according to China's specifications, more than 200 parking spaces need to be set up, with more than 4 disabled parking spaces. At onview
Water park equipment manufacturer: How long does it take to build a water park?
November 20, 2020The water park is basically divided into two parts, one is the civil engineering part, and the other is the water park equipment manufacturing and installation.view
English
Chinese
français
Español
русский
português
العربية
tiếng việt
ไทย
Pilipino
Indonesia
Afrikaans
info@gzhaisan.com
+86 13527814016
+86 13527814016
