Guangzhou Haisan Amusement Technology Co., Ltd.
Guangzhou Haisan Amusement Technology Co., Ltd.
Email Us
The construction progress of Vietnam project

The construction progress of Vietnam project

All the water park slides and water house are installed already, the construction team is installing the equipment for pump room now. Haisan’s engineers come to the site again for the installation supervision. All the equipment can be tested and operated soon.



The construction progress of Vietnam project 2

Related News
  • On the design and capital raising of theme park from the perspective of operation-1

    On the design and capital raising of theme park from the perspective of operation-1

    March 16, 2020At the beginning of 2020, the outbreak of new coronary pneumonia has led to many theme parks across the country to announce the "closed Park" announcement, which makes it easy to close the door. However, for the operation subject, the pressure can be imagview
  • Key points of Water park design

    Key points of Water park design

    October 16, 2019The key points of water park design are as follows: 1.Determine the nature and theme of the planning project (style). Don't blindly play the concept, because consumers want personal experience and personal experience, as long as the theme and style are hview
  • The Super Rolling Slide: A Revolution in Rotation and Dynamic Water Play

    The Super Rolling Slide: A Revolution in Rotation and Dynamic Water Play

    December 30, 2025In an era where guests constantly demand extreme thrills, water play has evolved beyond simple speed into a sensory art form engaging with gravity. As an industry innovation leader and full-chain serv...view
  • Facilities and layout of artificial swimming place in water slide design

    Facilities and layout of artificial swimming place in water slide design

    May 20, 2020In the design of the water park, the facilities and layout of the artificial swimming place must meet certain requirements, as follows: 1. The artificially constructed swimming place shall be equipped with swimming pool and emergency room, changing rooview
  • What is the principle of the water park design?

    What is the principle of the water park design?

    October 17, 2019Water park design, construction and operation of slides are highly consistent with park investors, managers and visitors. First of all, safety is always in the first place. As a special facility, it must be certified by the competent national authoritiview
  • Control three aspects for water slide

    Control three aspects for water slide

    June 29, 2020An ideal water park should allow visitorsto experience different water slides in a certain period of time according tospecific routes, and then visitors will get rich, continuous and rhythmicfeeling o...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us